Step 1: Enter the visible sign text and use
Enter the exact tactile sign copy and identify whether the sign marks a permanent room, gives directions, provides information or is temporary.
A measured preflight workflow for sign copy, contracted braille, dot geometry, spacing and mounting inputs—before fabrication or installation.
Generate Grade 2 braille from the intended visible sign text.
Confirm that the generated braille reads back to the intended message.
Check dot geometry, cell and line spacing, separation and mounting-height information.
Export findings and recorded inputs without presenting the result as legal certification.
Enter the exact tactile sign copy and identify whether the sign marks a permanent room, gives directions, provides information or is temporary.
Translate the visible text to contracted UEB Grade 2 and compare the back-translation with the intended message.
Record dot shape, dot diameter and height, spacing within and between cells, line spacing, separation from tactile text or borders and mounting-height inputs.
Resolve failed or missing checks against the federal 2010 ADA Standards baseline before sending the design to fabrication or installation.
Export the available preflight report, retain the measured inputs and confirm state, local and authority-having-jurisdiction requirements. The report is not certification.
No. It is a preflight against measurable federal baseline inputs. It does not replace fabrication quality control, installation inspection, state or local code review, or a decision by the authority having jurisdiction.
It reviews contracted braille and back-translation together with supplied dot shape, dot dimensions, cell spacing, line spacing, tactile separation, border separation, mounting range and basic door-side location.
Text translation alone cannot determine physical sign compliance. Dot geometry, spacing, mounting and location must be measured on the design or finished sign.
Yes. The checker uses the federal 2010 ADA Standards as a baseline. Applicable state, local and project requirements may add or change obligations.
Run it before fabrication, repeat it after design changes and verify the finished sign and installation using physical measurements.